Skip to main content
Loading…
This section is included in your selections.

The Director may modify the permit for good cause including, but not limited to, the following:

(1) To incorporate any new or revised Federal, State or local pretreatment standards or requirements;

(2) To address significant alterations or additions to the industrial user’s operation, processes or wastewater volume or character since the time of permit issuance;

(3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;

(4) Information indicating the permitted discharge poses a threat to the City’s POTW, City personnel or the receiving waters;

(5) Violation of any terms or conditions of the wastewater permit;

(6) Misrepresentation or failure to disclose fully all relevant facts in the permit application or in any required reporting;

(7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 C.F.R. § 403.13;

(8) To correct typographical or other errors in the permit;

(9) To reflect a transfer of the facility ownership and/or operation to a new owner/operator; and

(10) The filing of a request by the permittee for a permit modification does not stay any permit condition. (Ord. 106 § 6(9), passed 10-9-2012; Code 2014 § 52.06(I))