Skip to main content
Loading…
This section is included in your selections.

Construction drawings and specifications for public improvements shall be submitted to the City for drawing review and approval. Written approval, on the drawings, of the City Engineer or his/her designated representative is required prior to issuance of the permit.

(1) Drawings and specifications submitted for approval shall be subject to the standards, specifications, policies and procedures, and drawing review fees of the City in effect at the time of application or reapplication for drawing review. Additionally, said drawings shall be consistent with the City’s facility plan for the type of facility being constructed.

(2) Unless specifically waived in writing by the City Engineer, all drawings and specifications must be stamped by a registered professional engineer.

(3) Drawing and specification approval shall be void upon expiration of one year from the date of written approval. Drawing approval extensions may be granted by the City for a maximum of two extensions of one year (or portions thereof) each upon the finding by the City Engineer that the facts upon which the approval was based have not changed to an extent sufficient to require resubmittal of drawings for review.

(4) Only those drawings marked with the written approval of the City Engineer are valid for the purposes and requirements of this chapter. (Ord. 141 (Exh. A § 3), passed 12-11-2018)